
Bathroom remodels
built to stay dry.
Full bath and powder room remodels, from a vanity swap to taking it back to the studs and rebuilding the shower properly.
What matters here
Bathroom Remodeling done properly
Almost every failed bathroom we are called to fix failed at the waterproofing, not the tile. Membrane, slope and the transition at the curb are what decide whether a shower is still sound in ten years. We build that layer correctly and then tile over it.
Ask us about your projectWhat is included
- Waterproofing before any tile goes down
- Glass shower enclosures
- Vanities, countertops and mirrors
- Floor and wall tile
- Grab bars and accessible fittings
- Exhaust, lighting and finish trim
The work
What bathroom remodeling involves




How we work
Four steps, no surprises.
The same process on a commercial build-out and a bathroom remodel. Only the scale changes.
01WalkthroughWe look at the space with you and talk through scope, access and what has to stay open while we work.
02Written estimateLine-item scope and price, free. Exclusions named up front so nothing turns into a surprise change order.
03BuildOur own crew, containment where it is needed, and the work area reset broom-clean at the end of every day.
04Walk the punch listWe walk it together and close what you flag before anyone calls the job finished.
BC810278Licensed MN Building ContractorVerifiable through the Minnesota DLI licence lookup.
$25,000Contractor bondBonded to the Minnesota statutory amount.
$1M / $2MGeneral liability insurance$1,000,000 per occurrence, $2,000,000 aggregate. COI on request.
Open 7 DaysMonday to Sunday8am to 9pm, including evenings and weekends.
Free estimate for bathroom remodeling
Tell us about the space and we will come walk it. Commercial or residential.