
Tenant improvements
on a leasing deadline.
Suite turnovers and build-outs scoped by one contractor and finished by one crew, on the date the lease actually needs.
What matters here
Tenant Improvements done properly
Turnover work is a scheduling problem more than a construction problem. The date is fixed by the lease, not by the trades. We self-perform, which is the difference between one punch list and six subcontractor calendars that do not line up.
Ask us about your projectWhat is included
- Demolition and layout changes
- Steel and wood framing
- Drywall, ceiling grid and acoustic tile
- Flooring, paint and trim
- Doors, frames and hardware
- Punch list walked with you before sign-off
The work
What tenant improvements involves




How we work
Four steps, no surprises.
The same process on a commercial build-out and a bathroom remodel. Only the scale changes.
01WalkthroughWe look at the space with you and talk through scope, access and what has to stay open while we work.
02Written estimateLine-item scope and price, free. Exclusions named up front so nothing turns into a surprise change order.
03BuildOur own crew, containment where it is needed, and the work area reset broom-clean at the end of every day.
04Walk the punch listWe walk it together and close what you flag before anyone calls the job finished.
BC810278Licensed MN Building ContractorVerifiable through the Minnesota DLI licence lookup.
$25,000Contractor bondBonded to the Minnesota statutory amount.
$1M / $2MGeneral liability insurance$1,000,000 per occurrence, $2,000,000 aggregate. COI on request.
Open 7 DaysMonday to Sunday8am to 9pm, including evenings and weekends.
Free estimate for tenant improvements
Tell us about the space and we will come walk it. Commercial or residential.